A frac stack is a temporary, high-pressure Christmas tree bolted onto the wellhead for the fracturing job. It carries the full treating pressure and the sand that comes with it, so it needs a bigger bore and a higher rating than the production tree that goes on afterward. SLB’s glossary gives the usual stack-up: lower and upper master valves, a flow cross, wing valves, a goat head and a swab valve. Once the last stage is pumped and the well has been flowed back, the stack comes off and the production tree goes on. This guide goes through what each piece does, how the ratings work, what Texas requires during a frac, and why the treating iron running into the goat head needs restraints.

What is a frac stack?

Frac stack and frac tree mean the same thing. The SLB Energy Glossary lists “frac tree” as the alternate form and defines the stack as a Christmas tree installed specifically for fracturing.

The reason it exists is wear. FESCO explains that a frac stack temporarily replaces the production tree during high-pressure pumping with abrasive fluids, so the production tree isn’t damaged and doesn’t need costly repair or replacement. Oil States says much the same: the stack protects the production wellhead from pressure and abrasion while letting high pressures and large volumes of proppant reach the formation.

Frac stack components, bottom to top

The order below follows SLB’s definition. Real stacks vary, and on multi-well pads a zipper manifold can feed several stacks.

ComponentWhat it doesWhat to watch on location
Lower master valveThe first valve above the wellhead. Isolates the wellKept open while pumping. Its position should be confirmed in the walkdown
Upper master valveSecond barrier. Often hydraulically actuated so it can be closed remotelyAccumulator pressure and hydraulic hose condition
Flow crossThe block that the wing outlets branch fromFlange bolting and ring gaskets on every face
Wing valvesIsolate the side outlets used for flowback, bleed-off or monitoringKnow which wing is live. A capped wing is still part of the pressure boundary
Swab valveTop valve. Opens vertical access for wireline or plugsLubricator rig-up happens above it, so it gets cycled often
Goat head (frac head)The multi-port inlet where treating iron from the pumps ties inEvery inlet is a hammer union or flange carrying full treating pressure

Oil States lists three-way and five-way frac heads in its rental fleet. The more inlets, the more lines are tied into one spot at the top of the stack, and that changes how you plan restraints.

Frac stack vs production tree

Frac stackProduction tree
JobFracturing, then flowbackProducing the well for years
Time on the wellDays to weeksThe well’s producing life
BoreLarge. Rental fleets list 5-1/8 in and 7-1/16 in full-bore frac valvesSized for production flow
Typical rental pressure classes10,000 and 15,000 psi, with some valves at 20,000 psiMatched to the well’s shut-in pressure
What it handlesProppant-laden fluid at treating ratesOil, gas and water at producing rates

Rental figures are from the FESCO and Oil States lists; the production tree rule is Texas Rule 13, below.

Frac stack pressure ratings and API 6A

Wellhead and tree equipment is built to API Specification 6A. Its standard rated working pressures are 2,000, 3,000, 5,000, 10,000, 15,000 and 20,000 psi (Table 5 in the 21st edition). The frac rental fleets in the search results sit at the top of that range: FESCO lists 10K and 15K working-pressure equipment, and Oil States lists frac valves at 5K, 10K, 15K and 20K.

The rating on the stack is only part of it, because the whole system is limited by its weakest component. OSHA’s hydraulic fracturing hazard publication (OSHA 3763) tells employers to:

  • set pressure relief devices to discharge at or below the rated working pressure of the weakest component they protect, whether that’s the pump, piping, hose or a fitting;
  • pressure test the pump and discharge lines to at least the maximum expected treating pressure, without exceeding the rating of the lowest-rated component.

If one swivel or valve between the pumps and the goat head is rated lower than the stack, that part sets the limit for the job.

What Texas Rule 13 asks for during a frac

In Texas, the Railroad Commission’s Statewide Rule 13 (16 TAC 3.13) covers wellhead equipment and fracturing. Wells across the line in New Mexico follow New Mexico’s rules instead. The Texas provisions that touch the frac stack and the pipe below it:

  • Wellhead assemblies, 3.13(a)(6)(A): each component of the wellhead must have a pressure rating equal to or greater than the pressure it might see during drilling, testing or production.
  • Casing and frac tubing, 3.13(a)(7)(A): any casing string or fracture tubing that will see frac pressure must have a minimum internal yield rating of at least 1.10 times the maximum pressure it may be subjected to.
  • Pressure test before the frac, 3.13(a)(7)(B): the operator tests the casing (or frac tubing) to at least the maximum pressure allowed by the completion method. Strings with a pressure-actuated valve or sleeve are tested to 80% of actuation pressure for at least five minutes. A surface pressure loss above 10% of the starting test pressure is a failed test, the district director must be notified within 24 hours, and no frac can go ahead until a remediation plan is approved, carried out and re-tested.
  • Annulus monitoring, 3.13(a)(7)(C): all annuli are monitored during the frac. If pressure rises beyond what pressure or heat transfer would explain, the operator stops fracturing right away and notifies the district director within 24 hours.
  • The production tree that follows, 3.13(a)(6)(F): completed non-pumping wells need tree fittings and wellhead connections rated at least to the well’s surface shut-in pressure, a master valve on the tubing, and two master valves when surface pressure is over 5,000 psi.

Rule 13 puts these duties on the operator. The crew at the stack still needs a plan for them: if annulus pressure jumps mid-stage and the job stops, everyone at the wellhead should already know how pressure gets bled off and where to go.

Hazards at the frac stack

The stack carries the highest pressure on location, and a lot of rig-up and rig-down happens around it. OSHA 3763 lists the controls that apply during pressure pumping and flowback:

  • Inspect high-pressure lines from the pump trucks to the wellhead before the job begins.
  • Walk down the equipment against the written procedure and verify valve positions and relief settings before starting.
  • Follow the exclusion zone so only essential workers are near pressurized equipment.
  • Don’t let anyone strike a pressurized line or its connections. Positively confirm lines are depressurized before tightening or loosening hammer unions. OSHA notes serious injuries and fatalities have resulted.
  • Inspect equipment at rig-down, document its condition and pull suspect equipment from service.
  • Clearly mark, barricade or section off wellhead equipment so trucks moving on the pad don’t hit it.
  • During flowback, inspect and test iron before use and watch for sand erosion.

During flowback the wing outlets carry sand back out of the well, and OSHA flags sand erosion of the iron. It also warns that unrestrained lines “have been known to swing freely, striking workers and equipment.”

Restraining the iron tied into the goat head

Each line on the goat head holds stored energy. If a union, swivel or pup joint fails, the line’s free end moves with the full force of the pressure behind it. OSHA 3763 calls for high-pressure lines, relief lines included, to be restrained or secured with proven restraint devices and methods so they can’t whip.

A restraint system ties each section of treating iron to the next and to anchor points, so a failed connection stays close to where it was. It does not make the line safe to stand next to while pressured. The exclusion zone still applies, and restraints are no substitute for inspecting and testing the iron. Where restraints help most around the stack:

  • On the iron between the last ground-level connection and the goat head, where lines rise and change direction.
  • On flowback lines off the wing valves, which carry sand and see erosion.
  • On relief and bleed-off lines, which are easy to forget because they’re only live some of the time.

Mismatched hammer unions are a separate failure. The fittings look alike, a 1502 and a 602 can be made up together, and the connection can blow apart under pressure. See why mismatched hammer unions fail before rig-up.

Pre-job frac stack checklist

  1. Confirm the stack’s rated working pressure and the rating of every component between the pumps and the goat head. The lowest number is your limit.
  2. Check that relief devices are set at or below that limit and their discharge lines are secured.
  3. Confirm the casing pressure test passed and was recorded, as Rule 13 requires on Texas wells.
  4. Walk down valve positions against the written procedure: masters, wings, swab.
  5. Check accumulator pressure and hydraulic hoses on actuated valves.
  6. Walk every line into the goat head. Look for matched union figures, restraints in place and anchor points set.
  7. Barricade the wellhead area from truck traffic.
  8. Brief the exclusion zone and the muster point, and say who is allowed inside the zone while pumping.
  9. Line up annulus monitoring and agree on what happens if pressure deviates.
  10. At rig-down, inspect and document the stack and iron, and tag out anything suspect.

Restraint systems for frac and flowback iron

Site Safe Solutions installs high-pressure restraint systems for treating iron and flowlines from the pump discharge to the wellhead, and for hoses carrying slick-water, nitrogen or energized fluids on Permian Basin locations. For the standard behind frac iron itself, see the frac iron safety guide, and for the physics of what a parted line does, why an unrestrained line whips.